Task Force on Harbourfront Developments on Hong Kong Island
Twenty Second Meeting
Date: | 29 February 2016 (Monday) |
---|---|
Time: | 2:30 pm |
Venue: | Conference Room (Room G46) at Upper Ground Floor, Hong Kong Heritage Discovery Centre, Kowloon Park, Tsim Sha Tsui |
Meeting Minutes
Agenda
No. | Item | Papers | PowerPoint Presentation | Audio |
---|---|---|---|---|
1 | Confirmation of Minutes of the 21st Meeting | 2 minutes 11 seconds | ||
2 | Matters Arising
|
TFHK/01/2016 | 24 minutes 54 seconds | |
3 | The Urban Design Study for the Wan Chai North and North Point Harbourfront Areas – Study Progress and Proposed Stage 2 Public Engagement Work Plan | TFHK/02/2016 | By AECOM | 25 minutes 50 seconds |
4 | Reassembly of Queen’s Pier | TFHK/03/2016 | By Development Bureau and Civil Engineering and Development Department | 1 hour 11 minutes 34 seconds |
5 | Proposed Boardwalk underneath the Island Eastern Corridor | TFHK/04/2016 | By Civil Engineering and Development Department | 43 minutes 30 seconds |
6 | Proposed Short Term Tenancies for Government Land at Central Harbourfront for Staging of the Fédération Internationale de l’Automobile Formula E Championship - Hong Kong ePrix | TFHK/05/2016 | By Formula Electric Racing (Hong Kong) Limited | 36 minutes 53 seconds |
7 | Ground Decontamination Works at the Site of the Ex-Kennedy Town Incineration Plant/Abattoir and Adjoining Area | TFHK/06/2016 TFHK/07/2016 |
By Civil Engineering and Development Department and Mott Macdonald Hong Kong Limited | 55 minutes 13 seconds |
8 | Any Other Business
|
By students from Worcester Polytechnic Institute | 35 minutes 4 seconds |
Unless otherwise stated, documents are in PDF format and recordings are in MP3.